Supplier Management

 

Supplier Management and Partnership Principles

Harvatek is committed to establishing "stable and reliable long-term partnerships" with our suppliers.

Through a robust supplier management system, we ensure that product quality, delivery schedules, and service performance consistently meet operational requirements, fostering efficiency and transparency in our collaborations.

This section is designed to help suppliers understand Harvatek’s core management principles and cooperation requirements, establishing a clear and consistent foundation for long-term mutual growth.

 
 

I. Purpose and Scope

Supplier Management Scope and Evaluation Objectives

Harvatek has established a comprehensive management and evaluation mechanism for all vendors or contractors supplying the following items:

  • Key Raw Materials
  • Equipment / Assets
  • Parts / Spare Parts
  • Consumables
  • Other Procurement

The primary objective of supplier management and evaluation is to ensure that partnership outcomes meet long-term operational requirements:

  • Stable Quality
  • Reliable Delivery
  • Satisfactory Service
 
 

II. Supplier Classification and Definition

Supplier Categories and Definition Details

Suppliers are classified as follows based on supply category and strategic importance:

New Supplier Definition

Any vendor supplying relevant items to the company for the first time is considered a new supplier.

Criteria for New Suppliers

  • ISO 9001 Certified (Required for Class A)
  • ISO 14001 Certified
  • IATF 16949 Certified (For key suppliers)
  • Monopoly or Oligopoly Status
  • Parent Company or Original Factory
  • Customer-Designated Supplier

Supplier Category Descriptions

  • Class A: Suppliers of major raw materials listed in the BOM (Bill of Materials).
  • Class B: Suppliers of consumables that have part numbers but are not in the BOM.
  • Class C: Suppliers of spare parts without part numbers, fixed assets, controlled assets, and general procurement.
 
 

III. New Supplier Onboarding Process

Onboarding Procedures for New Suppliers

New suppliers must provide basic information and complete the following procedures as required by the company:

1 Required Documents
  • Supplier Basic Profile
  • Supplier Social Responsibility Commitment Statement
  • Integrity, Anti-Corruption, and Confidentiality Agreement
  • Conflict Minerals-Free Commitment (Based on category)
  • Emergency Contact and Communication Notification Form
  • Authorization Letter (Required for distributors/agents)
2 Evaluation Methods
  • On-site Audit: Domestic or international, as required.
  • Document Review: Comprehensive desk audit.

Evaluation Tools:

  • Harvatek Supplier Self-Assessment
  • Harvatek Subcontractor HSF Audit Report
  • Supply Chain Code of Conduct Audit Checklist
3 Results and Grading
GradeScoreDefinition
A91–100Qualified Supplier
B81–90Qualified Supplier
C71–80Observation Status
D≤ 70Unqualified Supplier
  • • Qualified suppliers will be added to the Approved Vendor List (AVL).
  • Grade C: Required to improve within a deadline and undergo re-evaluation.
  • Grade D: Generally disqualified from onboarding for two years (except customer-designated cases).
 
 

IV. Continuous Improvement and Annual Evaluation

Supplier Evaluation Tools and Procedures

1. Required Documents (Evaluation Tools)

Document NamePurpose
Annual Supplier ScorecardMonthly Quality / Delivery / Service scoring
Supplier Audit PlanAnnual planning of audit targets
Audit Assessment FormDetermining product / process audit requirements
Supplier Process Audit Report (VDA 6.3)In-depth process auditing
Subcontractor HSF Audit ReportHazardous Substance Free management audit

2. Evaluation Methods (Monthly, Semi-Annual & Annual Audits)

(A) Monthly Scoring (Class A Suppliers)

CategoryMax ScoreDeduction Factors
Quality (Q)40Rejections, process anomalies, complaints, HSF non-compliance
Delivery (D)30Delayed replies, delivery delays (Bonus for early rush orders)
Service (S)30Overdue responses, poor cooperation attitude

*Any single category scoring below 20 → Classified as Grade C immediately.

(B) Semi-Annual Comprehensive Rating

GradeScoreDescription
A90–100Excellent
B75–89Qualified
C60–74Observation
D≤ 59Unqualified

(C) Annual Audit Plan (Targets meeting any criteria)

Harvatek audits at least 10 suppliers annually based on risk and volume.

Audit TypeInclusion Criteria
Process AuditTop 3 suppliers, Semi-annual Grade B or below, Management designated
Product AuditRecurrent anomalies, customer complaints attributed to supplier

3. Evaluation Results and Follow-up Actions

(A) Grading Actions

GradeAction Plan
APriority procurement
BAudited at least once annually
CCorrective Action Plan (CAP) + On-site audit
DDisqualified; 2-year cooling-off period for re-onboarding

(B) Qualification Revocation

  • Poor corporate reputation/integrity.
  • Consecutive Grade C for 3 months without improvement.
  • Serious impacts on production due to delivery/quality.
  • Failure to execute Audit CAR (Corrective Action Report).

(C) Strategic Procurement

  • Top 3 suppliers in each category.
  • Annual Rating maintained at Grade A.
 
 

V. Improvement, Suspension, and Exit Mechanisms

Supplier Disposition and Rectification Standards

Follow-up actions are managed in accordance with corporate procedures:

1. Grade C Suppliers

  • Must submit a formal improvement plan within the specified deadline.
  • Subject to on-site audits to verify rectification progress if necessary.

2. Grade D Suppliers

  • Revocation of qualified supplier status (disqualification).
  • Ineligible for re-evaluation for a period of two years (except for customer-designated suppliers).

3. Chronic Non-performance or Poor Reputation

Qualified status may be revoked through formal procedures for suppliers with persistent quality issues or damaged corporate integrity.

4. Inactive Supplier "Freeze" Policy

  • • Class A/B: No transactions for 2 years → Account Freeze
  • • Class C: No transactions for 1 year → Account Freeze
 
 

VI. Special Circumstances and Exception Handling

Special Concession Registration

In special cases such as customer-supplied materials, customer-designated components, or urgent material requirements, the R&D department may approve a temporary onboarding without a full evaluation after verifying the samples.

Priority Adoption of Special Materials

To respond to specific customer requests or critical schedule constraints, materials may be utilized following inspection assisted by temporary specifications and regulations.

 
 

VII. Change Management and Notification

Major raw material suppliers must provide notification in the event of the following:

  • Internal organizational changes or manufacturing process variations
  • Product End-of-Life (EOL) or discontinuation
  • Changes in manufacturing location or raw materials
 
 

VIII. Environmental Policy Advocacy

  • The Company’s environmental policies and supplier initiatives are published on our official website. Suppliers are expected to actively promote and implement these standards within their own organizations.
 
 

IX. Miscellaneous Provisions

  • The Company does not currently procure embedded software for its products. Relevant clauses regarding such software will only apply should such procurement occur in the future.
  • Suppliers are required to cascade Harvatek’s requirements and standards down through their own supply chains.